What your Monday status meeting costs a year
A calculator for the meeting everybody attends and nobody owns – and what replaces it when the status lives next to the work.
Status meetings exist for a good reason: nobody knows the state of things otherwise. The cost is that the whole team pays for the update every week, at the same time.
What this meeting costs a year
€23,460
6 × 60 min ÷ 60 × 85 € × 1 × 46What the meeting is really for
- Which projects are at risk.
- Who is waiting for whom.
- What slipped, and what moves on.
- The decisions only leadership can make.
The first three can be read from the work itself. In Schedule Operator every project carries a health score, approvals have names, cycles close with what slipped, and the coach drafts a five-line status note – so that the meeting that remains is only about the fourth.

Then the Monday meeting can be shorter, smaller or gone. Try the calculator again with half the people and half the time.